| |
|
|
Who is this program designed for? |
|
| |
|
|
Plant owners who want to... |
|
| |
|
|
- Extend the life of a plant beyond its scheduled lifespan
- Increase the reliability of aging plants that require frequent maintenance resulting in irregular turnaround
- Improve plant flexibility in response to feedstock changes (sourer feedstock, more severe operating conditions, etc.)
- Increase reliability and availability
- Reduce the frequency of necessary inspection and maintenance
|
|
| |
|
|
Features of the Program |
|
| |
|
|
- "One-Stop Shopping"
JGC group can provide the full range of engineering services
- JGC's proposal is simpler and less expensive than RBI
- Unique EPC-contractor consulting methodology
JGC can not only find the best solution, but can also execute the proposal, according to the wishes of the client
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
Outline of the Program |
|
| |
|
|
This program is composed of following three steps. |
|
| |
|
|
|
|
| |
|
 |
 |
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
|
Time Schedule |
|
| |
|
|
An example of a time schedule for the Plant Reliability Assessment (PRA) phase is shown below (ex. a set for CDU, VDU and FCC unit) |
|
| |
|
|
|
|
| |
|
 |
 |
|
  |
 |
 |
 |
 |