| HOME  | CONTACT US  SEARCH 
 
 | SITE MAP | TERMS OF USE |  JGC 
Plant Life Extension Program with Reliability Assessment
      Who is this program designed for?  
      Plant owners who want to...  
     
  1. Extend the life of a plant beyond its scheduled lifespan
  2. Increase the reliability of aging plants that require frequent maintenance resulting in irregular turnaround
  3. Improve plant flexibility in response to feedstock changes (sourer feedstock, more severe operating conditions, etc.)
  4. Increase reliability and availability
  5. Reduce the frequency of necessary inspection and maintenance
 
     
Features of the Program
 
     
  • "One-Stop Shopping"
    JGC group can provide the full range of engineering services
  • JGC's proposal is simpler and less expensive than RBI
  • Unique EPC-contractor consulting methodology
    JGC can not only find the best solution, but can also execute the proposal, according to the wishes of the client
 
         
         
      Outline of the Program  
      This program is composed of following three steps.  
         
     
         
         
      Time Schedule  
      An example of a time schedule for the Plant Reliability Assessment (PRA) phase is shown below (ex. a set for CDU, VDU and FCC unit)  
         
     
Technology inquiries - Click here.
[PAGE TOP]
Copyright ©from 1996 JGC CORPORATION All rights reserved.