| HOME  | CONTACT US  SEARCH 
 
 | SITE MAP | TERMS OF USE |  JGC 
title
 

 

  The JGC Group executes projects around the world in business sectors ranging from resource development, oil, natural gas, and petrochemicals, to chemicals, pharmaceuticals, water resources, new energy, and the environment. In all of its projects, the Group constantly strives to fully consider Health, Safety, and Environment (HSE) concerns. HSE consideration is indispensable not only for plant EPC (engineering, procurement, and construction), but also for marketing and all stages of project execution, from feasibility studies to maintenance, plant decommissioning and projects other than EPC such as investment and service projects. The JGC Group strives to help create a sustainable society by combining its engineering and management capabilities with advanced HSE consideration.  
       
   
JGC aims to be a No. 1 HSE contractor.
We aim to faithfully fulfil our social responsibility
by considering HSE in every aspect of our business.
 
       
    Aiming to Be a No. 1 HSE Contractor  
    In recent years, the interest of operators and society in HSE as it relates to the design, construction, and operation of largescale facilities such as energy plants has risen. Requirements on contractors have become more stringent. JGC aims to maintain the trust of its clients and fulfil corporate social responsibility by becoming a No. 1 HSE contractor.  
       
    Combining Economic Efficiency with HSE at a Higher Dimension  
    In large plants, factors such as operating stability and ease of maintenance significantly affect economic efficiency during operation. JGC constantly strives to provide plants that combine economic efficiency with HSE consideration. With the understanding and cooperation of our clients, who are also operators, we provide plants that meet our own high HSE standards as well as legal requirements and the needs of the client.  
       
    Balance of Long-Term and Short-Term Perspectives  
    Energy and infrastructure facilities in operation around the world, even those which make full use of the latest technology, all have an impact on the environment over the long-term. Parties responsible for the concepts, detail specifications, and construction of these facilities must make a prior assessment not only of short-term economic rationality, but also long-term environmental impacts. By making sure all parties involved understand the essence of HSE and overall optimization, plants can be built that will meet with the approval of clients and society. JGC is keenly aware of the need for both shor-tterm and long-term perspectives and aims to be a company that achieves a good balance between the two perspectives.  
       
   
Health, Safety, and Environment Consideration at Every Stage of EPC
In this section, we report on specific examples of the JGC Group's consideration for the environment at every stage of plant construction and other EPC services.
Marketing/Feasibility Studies/Basic Planning (FEED)
Basic Engineering and Detailed Engineering/Equipment and Materials Procurement
Construction Planning/Construction Work
Maintenance/Facilities Decommissioning
     
Occupational Health and Safety
     
Environmental Consideration in Investment Projects and Research & Development
 
 
[PAGE TOP]
Copyright ©from 1996 JGC CORPORATION All rights reserved.